
KISHTWAR — The water level in the Chenab River may rise by around 2 to 3 metres from Sunday evening as NHPC's Dulhasti Power Station has scheduled mandatory periodic silt flushing of the Dul Dam reservoir.
According to NHPC Dulhasti Power Station, the silt flushing operation will begin at 8 pm on August 9 and continue until 6 pm on August 10.
The power station has cautioned residents living along the Chenab River to remain particularly vigilant during the operation, as the release of water from the dam may cause a sudden rise in the river's water level.
The public has been advised to pay close attention to the warning siren sounded before water is released from the Dulhasti Power Station and strictly follow instructions displayed on warning boards installed along the riverbank.
People have specifically been asked to stay away from the riverbanks during the period and refrain from activities including fishing, extraction of sand or wood and crossing the river except through designated bridges.
NHPC also cautions residents against allowing cattle to graze near the riverbanks during the silt flushing operation.
The article first appeared on The Kashmir Pulse at https://kashmirpulse.com/jk/jammu/chenab-river-water-level-may-rise-2-3-metres-as-nhpc-conducts-silt-flushing-at-dul-dam/115143.html
Post a Comment
Refrain from posting comments that are obscene, defamatory or inflammatory, and do not indulge in personal attacks, name calling or inciting hatred against any community. Let's work together to keep the conversation civil.